Stalled programmes, Rescued

How Transitive's senior SAP experts turn at-risk programmes into successful, fully integrated rollouts.

01

From three years of failure to a global SAP rollout

Agro-industrial

Background. Three years. One major system integrator. Zero workable design. The project had stalled — so Transitive's management experts stepped in to reset the approach and get it moving again.

Results. In under five years we designed, configured, developed and successfully rolled out the complete solution. Every site across Europe, the US and Asia now runs on a single, harmonised SAP platform delivering best-in-class processes end to end — enhanced quality management with full traceability across bulk, silo and packaged products, Extended Warehouse Management and transportation, global S&OP, EH&S, GTS, and the full suite of standard SAP modules.

3 international regionsSingle harmonised platformFull traceabilityUnder 5 years to go-live
02

Turning a stalling project into a shareholder success

Specialty food

Background. The system integrator couldn't deliver what the client needed. Staffed largely with junior consultants, the team lacked the depth to grasp the business where it mattered most — order-to-cash, quality, labelling and specialty manufacturing processes.

Results. In less than a year, with a small, senior team, we coached the integrator and redesigned, reconfigured and implemented a solution built around the client's real needs. The project is complete — and its shareholders count it a clear success, on budget and on ROI.

Under 1 year to completionSmall senior teamOn budgetPositive ROI
03

A four-site pilot rescued and scaled

Chemical industry

Background. After nearly two years of setbacks, the system integrator still couldn't deliver a four-site pilot that met the business requirements — and the client had neither the internal skills nor the resources to carry an SAP programme alone. Our team was called in to steady the project and bring it back on track.

Results. In under a year, a small Transitive expert team coached and supported the integrator on solution design and backfilled key internal roles to secure a successful pilot go-live. The project is now entering phase two: in under a month our experts visited the most complex operations across Asia, Europe and the US — capturing and documenting over 1,000 business requirements to accelerate design and configuration, sharing best-in-class process guidance, and helping structure and run the design workshops.

4-site pilot delivered1,000+ requirements captured3 continentsUnder 1 month on site